LBT Secondary Mirror

Operazioni di smontaggio della thin shell - Set. 2009

Adaptive Secondary Unit on the Integration Stand

1
 

Adaptive Secondary Unit on the Integration Stand

2
 

Detail of distribution boards and external actuators

3
 

DSP Control Boards

4
 

Uninstalling the thin shell

5
 

Detail

6
 

Fixed hexapod

7
 

Zerodur Reference Body

8
 

External actuators

9
 

External actuators

10
 

Thin Shell goes slowly down...

11
 

Thin Shell goes slowly down...

12
 

Mario checking the shell

13
 

Mario checking the shell

14
 

The Thin Shell with 585 magnets

15
 

The Thin Shell with 585 magnets

16
 

Mario, Roby & Silvano, very carefully...

17
 

Protecting the shell with "optical paper"

18
 

Magnets on the shell

19
 

Magnets on the shell

20
 

Magnets on the shell

21
 

Protecting the shell with foam rubber

22
 

Protecting the shell with foam rubber

23
 

The unit without the shell

24
 

Supply and switch BCU Cabinet

25
 

Unit tilting on the integration stand

26
 

Unit tilting on the integration stand

27
 

Unit tilting on the integration stand

28
 

Unit tilting on the integration stand

29
 

Reference body with capacitive sensors armatures

30
 

Reference body with capacitive sensors armatures

31
 

Reference body with capacitive sensors armatures

32
 

Numbered copper caps with armature

33
 

Coppered Caps over coil

34
 

The Quality Assurance Manager (Del Monte Man) "ha detto SI..."

35